讯石光通讯人才简历
简历最后更新时间:2019/1/9 14:09:00
基本资料
姓名: 罗先生   我的相片
性别: 身高:  0 CM
出生日期:  1981-06 体重:  0 KG
户口所在地:  江苏省|江苏全部 学历:  硕士
民族:  汉族 毕业时间:  0
联系信息: 【您未登陆,无法查阅联系方式!】
工作经验年限: 15~年以上
英语水平:  
* 期望工作性质: 全职
* 意向职位/岗位: 高级管理类,高级管理类全部
* 意向工作地区: 江苏省,江苏全部|上海,上海
期望岗位: ,,
待遇福利期望:  
当前岗位/待遇:  
所学专业:  
教育经历:
09/2014 ~ 07/2017 SiChuan University | Business Administration | MBA | Full-time:Yes

09/2000 ~ 07/2003 East of China Jiaotong University | Electronic Information Science and Technology | Diploma | Full-time:Yes 
工作经历:  
10/2015—Now    Sunway(3 years and 3 months)

PM manager  Face to face

Industry: Manufacturing(Raw Material Processing/Modeling)

Company Size: 1000-9999

Company Type: Private

Responsibilities:  1. Take charge of North American PM department management and team building;
2. Department budget assessment, headcount recruiting, PM training and promotion;
3. Work with sales to develop new business and research competitor’s information, orientation to achieve the goal of revenue and gross margin;
4. Work well relationship with key customer’s PD/SQE/tooling/PM team;
5. Lead cross functional team to work out valuable DFM & cost base on client conception design, and review it with customer’s PD, GCM and Tooling team;
6. Support sourcing team to develop appropriate supplier for strategy cooperation;
7. Kick off meeting, schedule timeline implementation from proto to PVT and ramp up successfully;
8. Organize engineering team to do documentation readiness before build, ensure every build on time/quality/cost without risk;
9. Lead teamwork to do trouble shooting to ensure product FAI, Cpk, PPAP, RF can meet the function spec which customer needs;
10. Regular project milestone, build report review with team and customer, and monthly presentation report to top management;
11. Motivate team member to improve communication skill, lesson learn during MP, KPI assessment and team building.
02/2012—09/2014    TE(2 years and 7 months)

NPI Manager & PIE  Face to face

Industry: Telecom & Network Equipment

Company Size: 500-999

Company Type: WFOE

Responsibilities:  1. In charge of NPI and oversea product transfer, project budget/capacity assessment, complete NPI procedure, CER release.
2. Kick-Off Meeting with project team and list project task assignment.
3. Assist RD to work out DFM in product/material/process and discussed with customer;
4. Layout workshop and equipped production line, fixture design, documentation work including SOP &Flowchart &PFMEA &BOM release, relative training.
5. Lead sample build and trial run, co-work with cross function team in data analysis and trouble shooting, ECN release, yield &UPPH promotion for MP.
6. Project regular meeting review with team/RD/Customer to track the project on Time /Quality/Cost. To achieve every milestone which customer request. 
7. Project stage review, sample release, process qualified, SPVR release and capacity ramp up plan for MP successful then transfer to PMC.
Title: TEOA Leader (LEAN Leader)
8. Assist Sr manager in implementation of TEOA 13 tools in factory and aim to the 3star sample factory prize in global, including VSM, SW, JIT, TPM, Mistake Proofing, SMED, QCPC, 6-Sigma, and so on. Also make sure operation KPI achievement.
9. 6-Sigma training and practice to improve process capability up to Cpk 1.67.
10. Assist EHS manager in Ergo study to improve safe workplace and risk elimination.
11/2003—12/2011    Flextronics Computing(Suzhou)(8 years and 1 month)

IE supervisor  Face to face

Industry: Manufacturing(Raw Material Processing/Modeling)

Company Size: 1000-9999

Company Type: WFOE

Responsibilities:  1. Handled subordinate PA assessment and promotion.
2. Workshop layout, machine capacity/manpower/OT planning.
3. NPI manufacturing cost estimation, time study/MOD analysis, SOP, PFMEA, PMP, OP training, the UPPH/quality of the production improvement for MP. 
4. Support RD for DFM and trouble shooting, fixture design.
5. Optimize line balance by ECRS, non-value added elimination for maximal capacity.
6. Support IT in MES system and SMT TRACEABILITY system, RFID system setup.
7. In charge of OEE improvement and report to Global OEE Team for competition.
8. Continual workshop kaizen, part time as a translator.
Project Experience
11/2015 — Now     XW023 & XW083 & XW065 & XW002 & XW004

Responsibilities: 1. Assist North American sales to expand business deployment to achieve the goal in revenue and gross margin, and work out BOE(Business Opportunity Estimation); 
2. Set up a cross functional team focus on new project to work out DFM and help sales to do RFQ to meet BOE; 
3. Communicate with global customer in technique development & requirement and translate to internal team for understanding, project budget estimation and control; 
4. Kick off meeting, task allocation and timeline setup base on schedule from EVT to MP; 
5. Organize engineering team to do 3D/2Ddrawing/tool/ fixture design and BOM setup; 
6. Motivate teamwork to ensure PMP, PFMEA, Flowchart, SOP, MSOP, SIP, 5M readiness before build, ensure sample build on time/quality/cost to avoid risk; 
7. Ensure product, FAI, Cpk, PPAP, build report can meet the goal which customer needs; 
8. Lead across-team to do trouble shooting in supplier, factory and customer; 
9. Regular meeting review the status of project with team and customer, and monthly presentation report(Milestone/KPIs) to top-management team for check; 
10. Guide team member to improve communication skill, lesson learn, KPI assessment and team building with motivation; 
11. Support the new business pursuits with technical proposals, continual improvement on cost, quality and lead time. And so on.
Project Desc: 1, Project-XW023 includes 12parts which connectors, stamping clips for Surface Book; 
2, Project-XW083 includes 2parts with cable clips; 
3, Project-XW065 includes 13parts with antenna, connector, clips; 
4, Project-XW002, 004 includes 8parts including NFC antennas, 4G antennas, shields and connector.
 Project-XW023 mass production successful to get revenue $3.5M; 
 Project-XW083 mass production successful to get revenue $0.6M; 
 Project-XW065 mass production successful to get revenue $4.0M; 
 Project-PF002, 004 is on PVT, it is close to mass production to get revenue $20M.
05/2012 — 08/2014     TCM001/2

Responsibilities: 1. In charged of project management, led a team work to drive it on schedule on quality;
2. Acted as the contact window between customer and project team for all project relative matters;
3. Played as a PIE to develop process and trouble shooting.
Project Desc: 1. Grade-B Optical fiber pigtail connector products and process develop to get the marketing shares €2million/FY13 in Europe and North America;
2. Grade-D Optical fiber pigtail connector products and process develop to get the marketing shares €17million/FY13 in Russia and Southeast of Asia.
1. TCM001 mass production successful in factory and get €2.2million business volume in FY13;
2. TCM002 mass production successful in factory and get €0.6million business volume in FY13. 
技能专长:  
简历留言: 1. 13+ years service in multinational company worked as PM & NPI & PIE & LEAN, goal orientation and good team work;
2. Skillful in LEAN/6-Sigma/OEE deployment in factory and NPI management, focus on 3C product and its component development & manufacture; be familiar with stamping, mold, LDS, SMT, and assembly process;
3. Aggressive to achieve a goal on schedule/quality /cost; fluent in oral English.